(330) 778-4316Call

Dover and New Philadelphia, Ohio

Basement remodeling and finishing in Dover, for space you'll actually use.

The home you've always wanted includes space you'll actually use. We serve homeowners by transforming their basements through a remodeling experience built on uncommon care and craftsmanship, clear communication and integrity.

Built-in black shelving with oak shelves and a desk nook

2 to 5 weeks

Standard finished basement, once work starts

Hands-on

We handle most plumbing and electrical ourselves

2 years

Written warranty on all workmanship

Starting at $35,000

Your written quote sets the fixed investment for your scope

Scope

What your basement project includes.

Picture the grandkids spread out downstairs on movie night, or a guest room that's ready whenever family visits. We start with how you'll use the space, and we look at moisture before we finish anything, because a nice room over a damp wall won't last. We handle most of the plumbing and electrical ourselves.

Finished room with a tile fireplace and gray armchairs
  • Framing and insulation for finished walls
  • Moisture checks and fixes before anything is closed in
  • Drywall, ceilings and trim
  • Flooring suited to a below-grade space
  • Lighting, outlets and new circuits
  • Basement bathrooms and wet bars
  • Family rooms, offices, guest rooms and play spaces
  • Egress windows for basement bedrooms

How the work goes

What a standard 2 to 5 weeks looks like.

Once the deposit is in and materials are on site, a standard finished basement takes 2 to 5 weeks. Yours may take longer depending on its size, special-order materials and conditions we find once work begins. We'll set a clear schedule for yours and tell you promptly if conditions change it.

  1. 01

    Prep

    The space is cleared, checked for moisture and measured for walls.

  2. 02

    Framing and rough-in

    Walls go up, and we run the wiring and any plumbing while they are open.

  3. 03

    Drywall and ceilings

    Walls and ceilings are hung, finished and painted.

  4. 04

    Flooring and finish

    Flooring, trim, doors and lighting go in.

  5. 05

    Walkthrough

    You walk the finished space with us, then we clean up and the 3-3-3 follow-up begins.

Older homes, honest expectations

What we often find in Tuscarawas County basements.

Basements here come in every age and condition. We look at what you have at the on-site assessment and price any fixes before work starts. If something unexpected turns up, we'll show you, explain your options and agree on the plan with you before work changes.

01

Water and moisture

Most wet basements start outside, with gutters, grading and downspouts. We check for moisture before anything is closed in and fix the source first. A coating on the inside alone rarely stops water from outside.

02

Foundation walls

Basement walls are poured concrete, block or stone, and each one frames differently. We identify the wall type first and plan the framing against it.

03

Low ceilings and ductwork

Older basements often have low ceilings, beams and ductwork in the way. We plan the layout around them and tell you early if a fix changes the finished ceiling height.

Straight answers

Basement remodeling questions, answered.

If yours isn't here, call or text us. It's the fastest way to an answer.

What does it cost to finish a basement in Dover?

Every basement is different, so we don't publish a single number. After a short conversation about your project, we can often give you a ballpark range. If it's a good fit, the on-site assessment ends with a written quote and a fixed investment for the scope it describes.

Is the first visit free?

The phone call is free. If it looks like a good fit, the on-site assessment is a paid consultation. You leave it with a written quote detailing scope, finishes and materials.

How long does a basement remodel take?

A standard finished basement takes 2 to 5 weeks once work starts. Yours may take longer depending on its size, special-order materials and conditions we find once work begins. We set a clear schedule and tell you promptly if anything changes it.

Do you do the plumbing and electrical?

We handle most of the plumbing and electrical ourselves. When a job calls for a specialist, we bring in skilled people we trust.

Is my basement too wet to finish?

We check for moisture before anything gets finished. If there's a problem, we'll explain what we see and your options, including waterproofing, before we build over it.

How soon will I hear back after I send a request?

Expect a reply by the next business day. If you are on a tight timeline, calling is the fastest way to reach us: (330) 778-4316.

Start here

Ready to talk about your basement?

Call or text us, or schedule an intro call online. A few photos of the space help us come prepared.

Call nowIntro call